PT1.1 - Engineering Goals

The purpose of this project is to create a bridge that can carry the greatest amount of weight for the amount of material,space and its own mass which is what is considered as most efficient for our task.We are limited to only using popsicle sticks for the construction and the glue provided.We will be using the bridge simulation in addition to the tests with actual sticks to find the how we can place the popsicle sticks in different arrangements to add to strength.Some of the things we will take in is to allow maximum surface area at glue joints as it is most likely to break.

No comments:

Post a Comment